Pioneer Pre Fabricated Steel Buildings is proud to announce our new "Do-it-yourself Steel Foundation". Click Here to view the animation in a larger size.

Click here to download a step-by-step guide showing the process of installing the foundation.


Get
Acrobat

Additional Info: Erecting a building | Base Connectors

 

 

 

 

 

 
This is a 50' wide x 22' high grain storage building bolted to a 2' high grade beam using the double bolt base connector. Note the exterior spacer bar.

Simple to erect. Pioneer steel buildings can usually be erected in 4 or 5 days without the need for special equipment.

Step 1 - Simply pour a floating concrete perimeter grade beam. You can fasten the building to the floating foundation using a base plate or trough connection.

Click on photos


Step 2 - The steel panels are easily assembled on the ground to form a complete arch.

Click on photos
Most buildings require only 3 people. 2 Men can raise 1/2 arches easily.

Tighten all bolts after the entire building is complete.


Step 3 - Arches are now ready to be pulled up into place and bolted.

Each end wall panel is pre-cut and numbered.
Layout the end wall on the ground first.
Install the end wall, end wall weather stripping and door frames.
End walls can be removed if you need to extend the length of the building.

Click on photos


Step 4 -Each end wall panel is pre-cut and numbered, so layout the end wall on the ground first. 


Step 5 -Install the doors and windows to your chosen custom or factory endwall. Your building is complete.

Factory Component Endwall Custom Endwall 
For most ordinary applications, our factory component endwall will suffice. However, there are times when you may want to customize your endwall to suit your needs. When you need to match or complement existing structures or extend and customize your building, a wide range of endwall options - and our user-friendly endwall adapters - make it convenient to complete your project consistently and economically.

manual Easy to read, step by step erection and foundation manuals with expert assistance a phone call away. (P. ENG sealed building and foundation drawings available on request)

 
Baseplates
Pioneer Baseplates make building simple and economical - with surprising DIY ease. These pre-drilled template-system plates are available in either the standard "U-Channel" or our special maintenance-free Industrial Quality model. Whichever baseplate option you decide on will depend on your foundation requirements - but each is designed to work with existing foundations, keeping easy, long-term relocation in mind.

 
Single or double bolt Galvalume connectors adapt to concrete or lumber. (Sealant Included)


Buildings may be bolted to walls at any height .

Double bolt base connector 10' x 16" floating grade beam. Pour slab anytime.

Base connectors can be bolted to flat slabs or a simple grade beam.
Base connectors are custom made to suit the exact angle of the arches. This base connector system does not require grouting.
Single bolt base connector. Single pour (slab) with 16" haunch beam.

Foundation Plans
Foundation plans and bolt layout provided prior to shipment

 

 

Non-Flash Browsers use these links:
Accessories | Applications | Ceramics | Erection and Foundation | Features | Home
Models | Technical Information | Our Company | Conditions | Contracts | Contact Us | Home