This is a 50'
wide x 22' high grain storage building bolted to a 2' high grade
beam using the double bolt base connector. Note the exterior spacer
bar. Simple to erect.
Pioneer steel buildings can usually be erected in 4 or 5 days without the
need for special equipment. |
|
Step 1
- Simply pour a floating concrete perimeter grade beam. You can fasten
the building to the floating foundation using a base plate or trough
connection. Click
on photos |
 |
|
|
|
|
Step 2 - The steel
panels are easily assembled on the ground to form a complete arch.
|
|
|
Step 3 - Arches are now ready to be pulled up into place and bolted.
 |
Each end wall
panel is pre-cut and numbered.
Layout the end wall on the ground first.
Install the end wall, end wall weather stripping and door frames. |
 |
End walls can
be removed if you need to extend the length of the building.
Click
on photos
|
Step 4 -Each end wall panel is pre-cut and numbered, so layout the end
wall on the ground first.
|
|
Step 5 -Install the doors and windows to your chosen custom or factory
endwall. Your building is complete.
 |
| Factory
Component Endwall |
Custom
Endwall |
|
|
|
For most ordinary
applications, our factory component endwall will suffice. However, there
are times when you may want to customize your endwall to suit your needs.
When you need to match or complement existing structures or extend and
customize your building, a wide range of endwall options - and our
user-friendly endwall adapters - make it convenient to complete your
project consistently and economically.
|
 |
Easy to read, step by step erection and foundation manuals with expert
assistance a phone call away. (P. ENG sealed building and foundation drawings
available on request) |
|